Use these settings to choose how to process and manage the additional Bill of Materials features from Cim200.
Open: Stock Control > Utilities > System Set Up > Cim200 Settings | Bill of Materials
Select from the following settings:
Sage Manufacturing
Home > Knowledgebase > Cim200 > Stock Control > Tools and Utilities > System Setup > Cim200 Settings > Bill of Materials > Introduction
Use these settings to choose how to process and manage the additional Bill of Materials features from Cim200.
Open: Stock Control > Utilities > System Set Up > Cim200 Settings | Bill of Materials
Select from the following settings:
Tick Enable Multiple Routes to allow more than one set of Operations, or routing, to be setup for a Bill of Materials.
This is a useful option when a manufactured item can be made in more than one way, and the way it is made will vary depending on external constraints such as production capacity or costs, sub-contract availability, component stock availability, lead times, etc.
Perhaps work is ideally done in-house on machine A, or if not available then on machine B; or perhaps the entire build will be sub-contracted.
Each route is a self-contained set of operations, and multiple routes can be setup against one Bill of Materials. If this option is enabled, the New, Amend and View Bill of Materials screens will have the Operations tab removed and replaced by a Routes tab, which contains the list of routes setup for the BOM.
As the option is enabled, for all BOMs any existing operations setup on the Operations tab will be migrated into a Route so that existing data is not lost. The Reference and Description of this Route can be set at this point.
In addition, on the Enter New Works Order and Amend Works Order screen, the option to select which BOM Route to use becomes available.
Tick Enable Multiple Component Lists to allow more than one set of Components to be setup for a Bill of Materials.
This is another useful option when a manufactured item can be made in more than one way, and the way it is made will vary depending on external constraints, such as component stock availability, or where there are interchangeable components.
Each component list is a self-contained set of components, and multiple component lists can be setup against one Bill of Materials. If this option is enabled, the New, Amend and View Bill of Materials screens will have the Components tab removed and replaced by a Component Lists tab, which contains a list of Component Lists setup for the BOM.
As the option is enabled, for all BOMs any existing components setup on the Components tab will be migrated into a Component List so that existing data is not lost. The Reference and Description of this Component List can be set at this point.
In addition, on the Enter New Works Order and Amend Works Order screen, the option to select which Component List to use becomes available.
Enabling Multiple Component Lists is a completely independent option from enabling Multiple Routes; the two are not linked.
Enabling Base Items in Cim200 allows for multiple completion outputs from a single Works Order, which is particularly useful when manufacturing bulk items with various possible outputs.
This functionality streamlines the process of managing multiple completion outputs, allowing you to easily handle scenarios where, for example, a bulk item is manufactured and various outputs are derived from the production line.
Base items are built items which are themselves used in the manufacture of other items, and where that usage happens immediately after production is completed.
Where a Base item differs from a regular built item is when a Works Order for a Base Item is Completed the user can record a quantity of one or more Output items (i.e. built items which contain the Base item in their Bill of Materials) to be completed instead of or as well as the Base item itself. Any other stock components on the Output items’ Bill of Materials will also get issued at this point.
For example, let’s say you are manufacturing paint in a batch of 1000 litres, which will be packaged into different-sized containers. The Bill of Materials for the paint batch includes Pigments, Binders, Solvents, and additives.
The Output items that are planned for production can also be set in advance on the Works Order at any time before completion, so the details can be printed on paperwork, and then default into the Complete Works Order screen.
To use this feature, tick the option to Enable Base Items. This makes a new ‘Is Base Item?’ checkbox available on the Enter New Bill of Materials, Amend Bill of Materials and View Bill of Materials screens, which determines whether the item will be treated as a Base item in the Complete Works Order screen.
If nominal integration is switched on in Stock Control, this account is used by the Reverse Build screen in Cim200 Bill of Materials.
Any discrepancy between the issue cost of the built item and the total receipt cost of the component items will be posted to Cost Variance.
Cost variances will be automatically posted to the nominal account set here.
If component parts have alternatives which can be used in their place during BOM Builds, they can be automatically substituted when the BOM component has a shortage. Tick Fulfil Component Shortages With Alternative Items to enable this option when using Record Built Items.
With this option enabled, when in the Record Built Items screen the Process button is clicked, to check stock of components, users have the option to use an alternative item in place of any components with a shortage, to allow the build to continue.
Alternatives can be setup on the Stock Item Details screen for the BOM component, in either the Alternatives tab, using the preferred alternative, or on the Details tab in the Superseded By field.
If there is no stock of the BOM component, Sage will source the total component requirement from the alternative item.
If there is some stock of the BOM component, but it is insufficient for the requirement, Sage will first use all the available BOM component then make up the shortage from the alternative item.
Note: This option is applicable only in the Record Built Items screen. It is not applicable in the New Allocation, Trial Kitting, Maximum Build, Costing or Explosion screens.
Cim200 automatically keeps a log of changes made to Bill of Materials records, which are visible on the Audit Log tab in the Amend Bill of Materials and View Bill of Materials screens.
As the audit log builds up the list of changes can grow large; it can be a useful housekeeping exercise to remove the oldest changes, so that it is easier to see more recent changes.
Click the Cleardown Audit Records button to clear down audit log records.
1. Specify the age range of audit records to remove in the Date Range calendar boxes.
2. To remove all changes made within the specified date range, leave All Users ticked.
3. Click OK to proceed and review the number of records that will be removed.
4. To proceed with the cleardown click Yes. To abort the cleardown click No.
Only applicable where multiple routes are in use on Bills of Materials, tick this option to have Save recost a BOM when it is created or amended.
Ticking this option should be done in conjunction with unticking a similar option in Bill of Material Settings | Costing, to avoid Sage prompting twice to recost the BOM.