Analysis codes are extra pieces of information that can be added to Works Orders or copied from the Bill of Materials.
Before using analysis codes in Works Orders, they must first be setup in Bill of Materials > Utilities > Maintenance > Maintain Operation Analysis Codes.
Each analysis code can optionally be given a set of values which can be selected from a drop-down list, or could allow for free text entry.
Where the same analysis code is used in both Bill of Materials and Works Orders, the analysis code value in the Bill of Materials will be copied automatically to the analysis code on the Works Order.
- Select the Analysis Codes
- Any analysis codes and values are listed.
Set or amend Analysis Code values
- In the Value field, type the appropriate value or select from the drop-down list, if applicable.
- Click Save to save changes to the works order.